Richard,
The mesh applied to the buried piping seems very dependent on the element lengths used. For example, a straight buried pipe of length 30m has a completely different mesh applied if the element lengths are consistent vs element lengths being varying lengths. This in turn produces different loads (say 0-50% change in my testing).
I did not know the buried piping was so sensitive to the element lengths.
How can this be explained?
Thanks