Dear Michael,

Thank you for your response, Please note that the building expansion is due to temperature changes and loads on each building.

Here each building can move 50 mm near the building expansion joint. Also our pipes are crossing at these the bundling expansion joint (Please Refer the Attachment).

We request you to advice us how to considered these kind of building expansion in CAESAR II software.

Also our client requesting to provide expansion bellow in the chilled water piping system near the building expansion joint.

Regards
Venket.A


Attachments
ENGG-SCAN_20210423_213919.pdf (271 downloads)