hi

I have a system with direct equipment to equipment straight connection with 9-meter pipe and I introduced an untied expansion joint with a limit rod to absorb the axial movement of the pipe. Here I didn't consider expansion joint thrust force at Equipment nozzle. However, I conveyed this thrust force to the equipment vendor and the civil department to design anchor bolt and foundation respectively. Is this approach correct?

Regards
Jai


Edited by Jay_Stress (08/15/20 12:20 PM)
_________________________
jp