Hello,
I was wondering what was the best way to represent a piping line that connects to an equipment and continues afterwards.
I have a clean steam unit that filters steam for sanitary application. This unit is a floor mounted skid on support structure. My hypothesis is that it acts as a rigid with anchored connexions to my piping lines.
Here is an overall view of what I'm trying to represent :
[img:left]
https://imgur.com/gi2W86t[/img]
I chose to represent this with a weightless rigid between both flanged connexions with anchors at both connecting nodes :
[img:left]
https://imgur.com/XodVEVD[/img]
Would that be a good approach ?
Thanks for the help