Hi Clint,
As Vanman pointed out, the best way to get data from the PIDs is through a database. After determining what reports you want, you then need to ensure your database tracks that information. From there, running the data through SOCKETWorx allows you to keep a holistic view of the project as well as report on the data from your PID's.

https://www.ecedesign.com/ece-software/socketworx/

In the end, reports are useless if you don't track the info. Make sure you set your projects up properly to get the data you would like.
_________________________
matt worland
ECE Design