Last time I dealt with a Cadworx import the node numbering was a pain because it seems to be based upon the sequence the designer drew the pipe. So if they had to go back and change things, the node numbering will be out of order/nonsensical.


If you're bringing in a lot of equipment/support structures try not including those and just re-defining them in Caesar if the export works.