If run a job with EC for OPE1 and with EH1 for OPE2,
change the NO.2 hanger design case from EC to EH1. The job run ,the hangerloads of OPE1 and OPE2 are all have some difference with the load of NO.1 hanger design case.

Why?

Is it wrong to use different elastic modulus for the NO.1 and NO.2 hanger design cases?



Edited by whm (05/21/19 02:34 AM)
_________________________
whmwhm