As danb noted, it appears to be CONSTRAINED BOWING/BULKING. The pipe run is not being allowed to expand at this high temperature of 410 C/ 770 F.
_________________________
Bob Zimmerman, P.E.
Vice President of The Piping Stress International Association (The PSI)