Dear Stressers
I have maybe stupid question but I don't have idea how to do this.
Now I working on the steam system.
This system connected two buildings and I have a long part of piping on the rack.

On the rack part I must add a uniform load and wind load so I started on first point outside.
This part I have done.
Unfortunately when I add in in point 600 I have this load from this point to end of instalation.
So my question is:

How to impelment a loads only for a part of piping system for example from Node 580 to 1230 ??
Thanks for Help

______________________________________

Adrian