This is the typical case with the systems having re-boiler. There is always a difference in Operating and Empty weight of the re-boiler. So, springs try to move up during NO FLOW (EMPTY) case. It may result into stress failure and increase in nozzle loads.

Thus, sometimes we need to provide -Y to pass in stress. Also, it simulates the exact behaviour of the system. So, your model is OK.