Hello everyone.

I am doing stress analysis of piping connected to coker drum. I have four(4) coker drums with 16 thermal cases as per coking/decoking schedule. We can only input nine(9) thermal cases in Caesar II and the design of the spring will vary if I made another separate files. I appreciate any advise on how to minimize thermal cases, etc. from those have experience doing this analysis.Thank you in advance.