if the pipe is not attached to the pipe rack steel but simply slides across the steel it will not be fully engaged by the steel however at guides, limit stops, hangers, anchors etc, where the line is physically connected to the steel it will be loaded accordingly.

As for 2mm/m well how much slop is in your constrcution?
_________________________
Best Regards,

John C. Luf