Hi,

I have done stress analysis for a boiler piping, which has only hanger supports in it. I have used the recommended load case available in the loadcase editor, with displacement at the Boiler nozzle. During analysis, I got the displacement around 2 to 3 mm in the SUS case (W+P1+H) throughout the system. But after installation, at some hanger supports the displacement is very high (around 80mm). I wish to know the reason as I am facing this problem for the first time.

Thanks & Regards