I am working on a drilling rig project, the upperdeck will be jacked up for the Installation with all piping & supports in place. During jackup the centre of rig will be deflected by 150mm. I have made a load combination as WNC+D1 (SUS). Do i have to consider the SIF on welded tee's for this condition?
_________________________
PRASHU