Thank you for the advice, that is the basic approach we have taken. Due to the limitations of the facility and the boiler vent/exhaust lines, we had to change direction from the centerline a bit. Minimizing those offsets are reducing the loads to within the limits.

We also have new structure above the boilers to support the outlet seismically.