Seismic Hoop combined Stress Calculation for Shell Course:
Impulsive Hoop Membrane Force per E.6.1.4-2b [Ni]:
= (2.77 * Ai * G * D^2)
* ((Y / D * 0.75) - (0.5 (Y / D * 0.75)^2))
= (2.77 * 0.375 * 1.100 * 49.213^2)
* ((6.562 / 49.213 * 0.75) - (0.5 (6.562 / 49.213 * 0.75)^2))
= 448.234 lb. [1993.744 N.]
Convective Hoop Membrane Force per E.6.1.4-4b [Nc]:
= cosh ( 3.68 ( H - Y ) / D )
/ cosh ( 3.68 * H / D )
* 0.98 * Ac * G * D^2
= cosh ( 3.68 ( 72.178 - 6.562 ) / 49.213 )
/ cosh ( 3.68 * 72.178 / 49.213 )
* 0.98 * 0.093 * 1.100 * 49.213^2
= 148.879 lb. [662.214 N.]
Product Hydrostatic Membrane Force [Nh]:
= 0.0361 * G * Y * 12.0 * D * 12.0 / 2.0
= 0.0361 * 1.100 * 6.562 * 12.0 * 49.213 * 12.0 / 2.0
= 923.258 lb. [4106.653 N.]
Total Combined Hoop Stress per E.6.1.4-6:
= (sqrt( Ni^2 + Nc^2 + (AV * Nh)^2 ) + Nh) / Thk
= (sqrt( 0.000^2 + 0.000^2 + (0.168 * 0.000 )^2 ) + 0.000 ) / 0.197
= 7215.565 psi [49748.438 KPa]
please check the report
the values are not matching in this calculation
and the units are not matching as per API 650 STD
and please clarify TH Nh value calculation
when i had provide the anchor bolt dia in input - 42mm
but the generated out put report shows 82.0mm instead of 42mm
please clarify
_________________________
robert anto reni