This is not a continuosly supporting pipe. It is a above ground long distance running pipe. (Run is aprx 1.5 km, roping length is 300 m. Support spacing 5 m., Pipe size is 34", Pipe schedule is 9.525 mm.

Does someone is having experiance in resolving in caesarII?