If the pipe will be supported by spring(s), the effect on nozzle due to WNC load should be considered as MoverZ had emphasized. If the tank is designed to API 650 and at seismic zone location, check the mandatory requirements of API 650 Table E-8 for possible seismic movements (+/-Y) of tank foundation if the seismic zone is applicable.