Good morning.
I have a system with springs that will be subjected to hydrotest from node 10 to 1000, and without hydrotest from nodes 1000 to 2000.
Is there a flag or some other methods to calculate the hydrotest loads in this situations?
Thank you.


Edited by Chakot (10/10/11 01:33 AM)