Dear Sirs,
1) Is boiler External piping the after first valve is governed by ASME B31.3 is it correct.

2)What are all the materials normally used as per asme B31.3 for Steam @ 250 Deg. C & Pr=10Kg/cm2

Thanks In ADvance
_________________________
snk