Dear Nald,
Could you tell me how you do a piping loading data using CAESAR I??
Are you modelling the structure and the pipe together in one model?
In case a pipe rack with many line how the way you do that?
Please enlighten me....because for piping loading data we usually using an excel format, that will calculate the Dead load of pipe and its content also its insulation, then we transmit it to civil, after that if we want to check the anchor load then we can use CAESAR, but most all the time it can be done manually, even for large plant.
Thanks.
_________________________
Tengku_Syahdilan
"From Failure we Learn"