1. PVElite considers that the equipment is lifted with the internals and insulation installed, which in case of towers is not always the case. How can this be modified? I have 6t of insulation and internals which are not lifted with the equipment and the tailing lug fails.

2. How is the input for lifting lugs considered in case of an equipment with a intermediate skirt? Are there the distances from the skirt base or from the bottom of the equipment?