We have one typical problem.
Our system has two case
Case 1: Ope+Weight+Pressure considered as sustained case
case 2: Ope+weight+pressure+long term settlement

My question is whether the second case shall be considered as sustained case ? Actually the system is failing in sustained case. However system is withing alloable limit for operating case ( Analysis code is B 31.8)