Hi everybody,

I am modeling a buried pipeline of which the battery limit is before a monoblock which is before the bend that takes the pipeline underground. The piping group wants displacements at the battery limit from me. The problem is there is an anchor at that node. Should I remove the anchor to have displacement at that node? or is there any way I can of going about it?

Thanks,
Oatty
_________________________
engineering