Hello Habib,

Yes you are right what I want to say is we prepare one more case as per client requirement its called erection case in that case we only considered the weight of pipe and operating temperature as ambient only. This is a same when pipe is just laid down on site and there is no fluid inside it. at that time we need to lock the spring.

Regards,
RK