Now we can move forward..........

Dear Khalid/Habib could you please make a sketch of your real problem (36" water filled line) you discribed, with original suppors arrangement.Mark all data required for inputting and analysing this 36 Inch water filled line which is connected to a equipment nozzle.Please also give Nozzle allowable loads.
Also attach a evaluation sheet for the following four load case after analysing this line.

Max Design Load case
Normal Operating Load case
Sustained Load case
WNC Load case(Hanger Active)
WNC Load case(Hanger Rigid)

Regards,
Aslam

Regards,
Aslam