As a guideline, I usually consider the anchor block if the resultant displacement at the A/G U/G transition is greater than 25mm. I picked this up from a stress analysis specification.

Just bear in mind that it doesn't necassarily mean that the allowable stresses for the above ground piping are exceeded if the resultant displacement is greater than 25mm.

Hope that helps smile