S, your 'perhaps' is misguided.

If you want to be sure that a pipe remiains where it was installed for the life of the plant, always include a linestop and suitable guides in long pipe runs.

Remember that if bay lengths are equal, a stress calc will show little or no force on a central line stop. This is often not the real case and most certainly not during start-up of a hot line.