I have a model which has some piping aboveground & some underground. I modeled the piping & used the buired modeler to put the soil details for the underground portion. After running the model I got a file with B attached.
Should the further analysis to put the restraints on the Aboveground portion be done on this file. Or i have to use the original file.

when is the original file used again during the analysis