Hello again..

Is it correct to evaluate Peq under the following conditions:

*(OPE) W+T1+P1 (Line operation condition)
*(OPE) W+T2+P2 (Line design condition)


Or if it is not correct, in which condition should I evaluate the line?


Regards.