Our project is now on construction phase so drastic change to the line is not acceptable. I already used Liberal stress allowable but still not ok. The only possible solution I can think right now is to change stopper locations and additional guides to control expansion. But this afternoon, I'll discuss this matter to my boss.
Thank you so much to everyone. I really appreciate it. This is a lesson for me.