First of all Thanks for your Contribution.

Sir the main problem is the Turbine at Open Place. there is no building to cover the turbine and the pipe is at 14mt Elevation. I am agree with ur point that Earthquake is a survival situation and not an operational one. Surely the plant would shut down due to all manner of detectors in that event.

As far as wind is concerned .... i am getting forces 5 times higher than the allowable. Allowable Forces are 1000N and Moments are 10000N.
I already foward my analysis report to Client. If there is any additional allowable limit for Wind than its ok otherwise i have to seach for some alternative.

Regards
Daman