Hello Fellow Stressers!!

Is it allowed to weld a cleat support in reactor for vertical riser piping?

Thanks,
_________________________
Borzki

Top
#76390 - 04/13/22 09:24 AM Re: Reactor Piping Supporting [Re: Borzki]
Borzki Offline
Member

Registered: 09/16/04
Posts: 759
Loc: Traz
We're on the same page in this case.

Cheers!
_________________________
Borzki

Top
#76391 - 04/13/22 11:08 AM Re: Reactor Piping Supporting [Re: Borzki]
danb Offline
Member

Registered: 04/22/05
Posts: 1453
Loc: ...
What kind of reactor?

Is it inside a structure? if it is, then no. Use the structure.
Does it have ladders and platforms welded on it? if yes, then maybe.. ask reactor manufacturer.
If no ladders and platform and not inside a structure, then use the skirt to support the riser on the lower elbow by asking the manufacturer to add bracket on the skirt.

The question is too vague.
_________________________
Dan

Top
#76392 - 04/13/22 11:16 AM Re: Reactor Piping Supporting [Re: danb]
Borzki Offline
Member

Registered: 09/16/04
Posts: 759
Loc: Traz
Thanks danb. I thought there is really something special to it because I've heard about it.

Anyway, I'll cross the bridge when I get there. So far not yet analyzing such system.

Cheers!!
_________________________
Borzki

Top
#76427 - 05/09/22 01:08 PM Re: Reactor Piping Supporting [Re: Borzki]
Edward Klein Offline
Member

Registered: 10/24/00
Posts: 334
Loc: Houston, Texas, USA
If it's something that's already existing that you are adding/modifying pipe on as part of a revamp....that's going to be a challenge.

IF it is being designed as fabricated as part of the project you are working, then you should be able to coordinate with the equipment engineer to get attachments included to support your piping.
_________________________
Edward L. Klein
Pipe Stress Engineer

All the world is a Spring

Top
#76428 - 05/10/22 10:07 AM Re: Reactor Piping Supporting [Re: Edward Klein]
Borzki Offline
Member

Registered: 09/16/04
Posts: 759
Loc: Traz
Thanks for the advice. That's correct, in the end it's the Vendor who will be responsible to qualify according to Code requirements. But is thermal gradient possible in the reactor to cleat connection which can cause thermal fatigue?

Warm Regards,
_________________________
Borzki

Top



Moderator:  Denny_Thomas, uribejl 
Who's Online
0 registered (), 27 Guests and 2 Spiders online.
Key: Admin, Global Mod, Mod
April
Su M Tu W Th F Sa
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30
Forum Stats
12065 Members
14 Forums
16973 Topics
75151 Posts

Max Online: 303 @ 01/28/20 11:58 PM
Top Posters (30 Days)