Ahmed,
Annex F is only capable if you're directly using Table 5 values without multiplier.
If you have ordered pumps to withstand 2xAPI loads, then Annex F is out of picture (because than your loads are 4 times).
Either reduce loads or get vendor's approval for higher loads.Obviously, cost will be in picture then.
_________________________
Keep Smiling
SJ