I try to keep the saggment not over 0.1'' as B31.1, but if the line sloped, when the plant is not operated, as long as the saggment does not create low point I consider drain will eventually collected to drain pot(or so). Then, water hammer would not be caused by condensate at the plant start-up.
Of course, there could be lack of drain pot or mis-installation etc. but that's another things to consider I guess.
FYI, my current project steam piping slope is 1/100.