Dear. all

I have infromation about snow load but I couldn't input the
Caesar program. coz I'am not sure.

formula:
s = s0μ
Where:
s is the value of snow load on the horizontal projection (kN/m2)
s0 is the characteristic value of snow load on the ground =0,7 (kN/m2)
μ is the snow load shape coefficient = 0,4

When I input Uniform load, How can i change kn/m2 -> kgf/mm
and Do i consider pipe diamater? i think we already input the
all pipe information. so, i think just need typical snow load and caesar2 automatically calculate(F/L).


Edited by Yonik (04/07/15 11:43 PM)

Top
#62630 - 04/08/15 06:48 AM Re: snow load [Re: Yonik]
Richard Ay Offline
Member

Registered: 12/13/99
Posts: 6226
Loc: Houston, Texas, USA
Take your load in KN/m2 and multiply by the pipe diameter, which will give you the uniform load in KN/m. That is the input needed for CAESAR II.
_________________________
Regards,
Richard Ay - Consultant

Top
#62642 - 04/08/15 06:50 PM Re: snow load [Re: Richard Ay]
Yonik Offline
Member

Registered: 04/05/15
Posts: 3
Loc: KOREA
Thanks for your quick response.
but I 'am still confusing....
Please give me a Example.


Edited by Yonik (04/08/15 06:50 PM)

Top
#62643 - 04/08/15 07:18 PM Re: snow load [Re: Yonik]
Richard Ay Offline
Member

Registered: 12/13/99
Posts: 6226
Loc: Houston, Texas, USA
Sorry, I missed the weight conversion. You can look up the conversion from KN to KGF, it's about 101.97. Just write it out with units and you can obtain the unit load in KGF/M.
Once you have that, then convert from M to mm.
_________________________
Regards,
Richard Ay - Consultant

Top



Moderator:  Denny_Thomas, uribejl 
Who's Online
0 registered (), 43 Guests and 0 Spiders online.
Key: Admin, Global Mod, Mod
April
Su M Tu W Th F Sa
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30
Forum Stats
12065 Members
14 Forums
16973 Topics
75151 Posts

Max Online: 303 @ 01/28/20 11:58 PM
Top Posters (30 Days)