I'm analysing Pressure reducing and metering station (PRMS) using b31.8 for 3[m] burried pipe will you use the underground pipe modeler? i am not familiar with burried pipe equations.
Registered: 12/13/99
Posts: 6226
Loc: Houston, Texas, USA
You should take a look at B31.8 before attempting any analysis. Yes you need to use the underground modeler so that your model has the appropriate soil restraints.
_________________________
Regards, Richard Ay - Consultant