Hi all,

I'm new at this kind of issue:

I have to approve the Nozzle Loads as shown below:

Fx= 2100 N;
Fy= 2670 N;
Fz= 2670 N;
Mx= 1425 N.m;
My= 1425 N.m;
Mz= 1425 N.m;

The nozzle is 2".

How can I approve these loads??

It's necessary to perform a FEM analysis of the nozzle and the related equipment? or there is another way less sophisticated?


TY.

Top
#60480 - 09/15/14 11:15 AM Re: nozzle load approvement [Re: tqd_stress_analysis]
Pablo_GH Offline
Member

Registered: 05/18/13
Posts: 52
Loc: Spain
Dear,

Which equipment do you have? Pump, turbine, heater, vessel, tank...

Depending on your equipment, read and study the CODE which applies (API 650,API661, API610, etc.). You will have how to validate the loads.

Regards,

PG

Top
#60481 - 09/15/14 12:29 PM Re: nozzle load approvement [Re: Pablo_GH]
tqd_stress_analysis Offline
Member

Registered: 03/12/14
Posts: 74
Loc: Italy
The equipment is a manifold.

I have to validate theese loads for a nozzle, and a weldolet too.

Preliminary we considered as allowable loads on the nozzle 3 time the API. The client now ask if we can consider 5 time API.

By the way, a question tha can be stupid for the most expert: why in some projects I saw that allowable loads are 5 time API and in other project 3 time the API. It's just a metter of precaution?

The nozzle is 2".

TY.

Top
#60558 - 09/24/14 09:10 AM Re: nozzle load approvement [Re: tqd_stress_analysis]
tpkarmakar Offline
Member

Registered: 09/21/09
Posts: 6
Loc: new delhi, india
Which API allowable are you following?

Top
#60563 - 09/24/14 11:27 AM Re: nozzle load approvement [Re: tqd_stress_analysis]
tqd_stress_analysis Offline
Member

Registered: 03/12/14
Posts: 74
Loc: Italy
I'm following API 560. Fired Heater exchanger.

Preliminary we considered 3 time API allowable. Now a stress engineer ask me to consider an allowable load on the nozzle of 5 time API.

Top
#60564 - 09/24/14 02:26 PM Re: nozzle load approvement [Re: tqd_stress_analysis]
dclarkfive Offline
Member

Registered: 01/11/07
Posts: 64
Loc: Calgary, Alberta, Canada
I have seen 5xAPI for Fired Heaters. Loads in excess of 1xAPI are acceptable, as long as the equipment manufacturer gives their approval.
_________________________
Regards,
Dave Clark

Top
#60604 - 09/29/14 03:16 AM Re: nozzle load approvement [Re: tqd_stress_analysis]
Pablo_GH Offline
Member

Registered: 05/18/13
Posts: 52
Loc: Spain
If you are studying a Fire Heater, then API 560 is the correct code to be used, as it covers this equipments (in your case table 8 & table 9 for manifolds).

As Mr. dclarkfive says, normally the manufacturer is the one approving loads (in projects, at the beginnig, we request the timesxAPI we will require for heaters).

Ask them how many timesxAPI that nozzle withstand. That will give you the approval.

Regards,

PG


Edited by Pablo_GH (09/29/14 03:18 AM)

Top



Moderator:  Denny_Thomas, uribejl 
Who's Online
0 registered (), 44 Guests and 1 Spider online.
Key: Admin, Global Mod, Mod
May
Su M Tu W Th F Sa
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Forum Stats
12065 Members
14 Forums
16973 Topics
75151 Posts

Max Online: 303 @ 01/28/20 11:58 PM
Top Posters (30 Days)