I have to validate theese loads for a nozzle, and a weldolet too.
Preliminary we considered as allowable loads on the nozzle 3 time the API. The client now ask if we can consider 5 time API.
By the way, a question tha can be stupid for the most expert: why in some projects I saw that allowable loads are 5 time API and in other project 3 time the API. It's just a metter of precaution?
If you are studying a Fire Heater, then API 560 is the correct code to be used, as it covers this equipments (in your case table 8 & table 9 for manifolds).
As Mr. dclarkfive says, normally the manufacturer is the one approving loads (in projects, at the beginnig, we request the timesxAPI we will require for heaters).
Ask them how many timesxAPI that nozzle withstand. That will give you the approval.