Dear Richard & Dave,

I am reading COADE book for this water hammer analysis procedure.
I am reading EI guide line for calculating LOF and further actions required.

I have one doubt regarding SMALL BORE LINE CONNECTIONS (SBC), generally for SBC, we will give less preference or even we didn’t take into analysis but In EI guideline, they given a separate assessment for MAIN LINE & SBC also.

My doubt is SBC lines should be included in the CAESAR-II analysis or not.

Please correct me if I am wrong.
_________________________
Thanks,
Durga

Top
#58946 - 05/11/14 10:35 PM Re: Water hammer analysis by CAESAR-II & EI Guide line [Re: durga]
stressengineer Offline
Member

Registered: 08/07/09
Posts: 36
Loc: india
DO YOU MEAN VIBRATION ANALYSIS FOR SMALL BORE CONNECTIONS.

Top
#58948 - 05/12/14 12:25 AM Re: Water hammer analysis by CAESAR-II & EI Guide line [Re: durga]
durga Offline
Member

Registered: 06/18/12
Posts: 345
Loc: India
Yes
_________________________
Thanks,
Durga

Top
#58949 - 05/12/14 12:49 AM Re: Water hammer analysis by CAESAR-II & EI Guide line [Re: durga]
stressengineer Offline
Member

Registered: 08/07/09
Posts: 36
Loc: india
You can check it manually by calculation (As per MTD guidelines).

Top
#58954 - 05/12/14 04:06 AM Re: Water hammer analysis by CAESAR-II & EI Guide line [Re: durga]
durga Offline
Member

Registered: 06/18/12
Posts: 345
Loc: India
Can I know the page no. and chapter name
_________________________
Thanks,
Durga

Top
#58973 - 05/13/14 03:17 AM Re: Water hammer analysis by CAESAR-II & EI Guide line [Re: durga]
durga Offline
Member

Registered: 06/18/12
Posts: 345
Loc: India
Any comments..
_________________________
Thanks,
Durga

Top
#58991 - 05/13/14 09:49 PM Re: Water hammer analysis by CAESAR-II & EI Guide line [Re: durga]
durga Offline
Member

Registered: 06/18/12
Posts: 345
Loc: India
Dear Richard & Dave,

I am reading COADE book for this water hammer analysis procedure.
I am reading EI guide line for calculating LOF and further actions required.

I have one doubt regarding SMALL BORE LINE CONNECTIONS (SBC), generally for SBC, we will give less preference or even we didn’t take into analysis but In EI guideline, they given a separate assessment for MAIN LINE & SBC also.

My doubt is SBC lines should be included in the CAESAR-II analysis or not.

Please correct me if I am wrong.
_________________________
Thanks,
Durga

Top
#59167 - 05/27/14 11:04 AM Re: Water hammer analysis by CAESAR-II & EI Guide line [Re: durga]
Dave Diehl Offline
Member

Registered: 12/14/99
Posts: 2382
Loc: Houston, TX, USA
In my opinion, those EI guidelines provide a method to evaluate SBCs likelihood of failure without the use of analysis tools like CAESAR II. simple guidelines.
This implies, to me, that such lines are not included in the dynamic evaluation of the main lines thus the need for a screening tool.
If the small lines affect the dynamic response of the main line, then the small lines should be included in the dynamic evaluation of the main line.
_________________________
Dave Diehl

Top
#59259 - 06/05/14 12:01 AM Re: Water hammer analysis by CAESAR-II & EI Guide line [Re: durga]
durga Offline
Member

Registered: 06/18/12
Posts: 345
Loc: India
Dear Dave,

From which result we can judge that "small lines affect the dynamic response of the main line" ?

According to EI guide line, we can calculate LOF of SBC lines from that we have to judge? or any other ideas..
_________________________
Thanks,
Durga

Top
#59272 - 06/05/14 02:53 PM Re: Water hammer analysis by CAESAR-II & EI Guide line [Re: durga]
Dave Diehl Offline
Member

Registered: 12/14/99
Posts: 2382
Loc: Houston, TX, USA
I cannot say that there is any general rule on whether or not to include smaller lines in dynamic analysis. (It's not just stiffness and not just mass, but the combination of both.) You can build up your own criteria by running models both ways - with and without smaller lines - until you establish your understanding.
_________________________
Dave Diehl

Top
#59281 - 06/05/14 09:46 PM Re: Water hammer analysis by CAESAR-II & EI Guide line [Re: durga]
durga Offline
Member

Registered: 06/18/12
Posts: 345
Loc: India
Thanks Dave for your valuable reply,

I will do that activity.
_________________________
Thanks,
Durga

Top



Moderator:  Denny_Thomas, uribejl 
Who's Online
0 registered (), 34 Guests and 2 Spiders online.
Key: Admin, Global Mod, Mod
May
Su M Tu W Th F Sa
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Forum Stats
12065 Members
14 Forums
16973 Topics
75151 Posts

Max Online: 303 @ 01/28/20 11:58 PM
Top Posters (30 Days)