Kidnly help me in this regards. I need to do analysis of pipes for lifting the pipes already commissioned for placing Neoprene pad beneath them. I need help in following regards.
1. What will be the basis for evaluation of stresses?
2. Whether I need to check the expansion stresses?
3. How to simulate the said sceario in CII?

Code for design is B31.4 and we are planning to lift the segments around 50 m at a time for the continuos pipe run of 3-4 km.


Edited by PanKh (05/08/14 08:08 AM)
_________________________
Pankh

Top
#59395 - 06/16/14 01:30 PM Re: Analysis for Lifting of piping segment [Re: PanKh]
John Schmidt Offline
Member

Registered: 12/01/08
Posts: 8
Loc: Texas
I would model a displacement at the lift points and set the conditions for those that will exist at the time of the lift. Preferably cold and empty.

Top
#60925 - 10/29/14 11:10 PM Re: Analysis for Lifting of piping segment [Re: PanKh]
PanKh Offline
Member

Registered: 04/20/14
Posts: 6
Loc: India
Thank you John.
I have followed the same approach for the same.
_________________________
Pankh

Top



Moderator:  Denny_Thomas, uribejl 
Who's Online
1 registered (Surjeet_Kumar), 44 Guests and 2 Spiders online.
Key: Admin, Global Mod, Mod
May
Su M Tu W Th F Sa
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Forum Stats
12065 Members
14 Forums
16973 Topics
75151 Posts

Max Online: 303 @ 01/28/20 11:58 PM
Top Posters (30 Days)