Hi friends from this great fórum....

I believe that it the best in the network.

I have a Piping system that was designed in a marine plataform in the gulf of Mexico. The piping run on elev. 19.100 50% and down up to elev. 16.400 (Wave Zone) My análysis cover all the system...
For the elev. 19.100 I use the Code B31.3 but when the piping down up to Wave zone ... Can I use the same code ??

For the piping down to elev. 19.100 is necesary consider a Wave analysis.... The Caesar II Can't handle WInd and Wave into a same analysis.... My versión no (5.10) why ?? I must to make a analysis for Wave only ??

Thank you very much
_________________________
CAESAR II

Top
#57034 - 11/29/13 06:29 PM Re: Offshore Piping [Re: caesarV]
Richard Ay Offline
Member

Registered: 12/13/99
Posts: 6226
Loc: Houston, Texas, USA
Yes you can model both wind and wave on the same model.

You should talk to your project Engineer as to what Codes are required. Two additional Codes you might consider are "B31.4 Chapter 9" and "B31.8 Chapter VIII" - both of these cover offshore analysis of piping systems.
_________________________
Regards,
Richard Ay - Consultant

Top
#57037 - 12/01/13 10:46 PM Re: Offshore Piping [Re: caesarV]
sandip_vadher Offline
Member

Registered: 05/29/12
Posts: 22
Loc: India
Richard,

Also, DNV code can be used for subsea pipelines.

Regards,
Sandip Vadher
KBR-AMCDE (KSA)

Top



Moderator:  Denny_Thomas, uribejl 
Who's Online
0 registered (), 46 Guests and 6 Spiders online.
Key: Admin, Global Mod, Mod
May
Su M Tu W Th F Sa
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Forum Stats
12065 Members
14 Forums
16973 Topics
75151 Posts

Max Online: 303 @ 01/28/20 11:58 PM
Top Posters (30 Days)