Hai all,

As per pipe stress analysis, i gave Nozzle load to vendor for WRC check. Vendor check the nozzle load and give WRC 107 report and WRC 297 report. In the case, nozzle load qualified in WRC107 and not qualified in WRC 297.

My question,
In what basis, vendor check the nozzle load in both conditions.