DEAR SIR,

FOR SEISMIC DESIGN FOR HORIZONTAL VESSEL,

WHILE CALCULATING THE SEISMIC LOAD THE OPERATING WEIGHT MULTIPLYING WITH THE ACCELERATION SHALL BE UNCORRODED OPERATING WEIGHT.

BUT PV ELITE IS NOT CONSIDERING THE UNCORRODED WEIGHT.

CAN U PLEASE REVERT.

--FROM--
KETAN DARAJI
STATIC ENGINEER/BARODA
_________________________
nil