Hi to all readers,
If Code Compliance for Design case is 98% then in What Time period for Design temperature and Design Pressure can hold the pipe line stable with out serious damage to line.
actually when pipe line goes Design conditions Operation guys in plant control the valve percentage of opening and closing, So When our Design code stress is at 98% then we can assume in an Hour or less there will not be any problem, as they are tunning down the valve to operating condition.
So, my question is even at 98% code stress line will be safe for 1 hour or more/less.
Thank you for replying.
Edited by runner (10/18/11 07:51 AM)