CAN ANYONE PLEASE TELL ME HOW TO INPUT INTO PV ELITE A SECTION OF PIPE WITH FLANGE AT ONE END OF PIPE AND PIPE CAP AT OTHER END.
FOR THIS INSTANCE 4" NB PIPE x SCH 80 WITH PIPE CAP AND OTHER END 4" WN 150 lb RATED FLANGE.
AT PRESENT USING DIFFERENT LAYOUTS AND OPTIONS I HAVE YET TO FIND A WAY OF GRAPHICALLY SHOWING THIS PRIOR TO ANALYSING.
THANKYOU.