Dear All,
I have faced with an unusual problem in HP Steam line stress analysis. Please refer to attached sketch that shows there are two 12” steam lines that will be connected to together with new size 16”. The weight of valve “A” is 3.6 ton and valve “B” is 3.5 ton.
Because of the high deflection in this line (about 40 mm) I have to use spring hangers before, between and after these valves.
But when I did stress analysis the hot loads of hangers are as follow :
Spring Hangers 10/30 : App. 500 kg
Spring Hangers 20/40 : App. 7.5 ton
Spring Hanger 50: App. 6 ton.
That means the hangers 10/30 have a little effects on carrying the weights and also I like to have a simple spring hangers in nodes 20/40, actually I want to distribute the loads between spring hangers before and after valves.
So I entered the value 4500 kg in CAESAR II hanger input data (Operating load blank space) and when I did analysis the loads distributed properly between hangers 10/20/30 and 40.
My questions are:
1- Can I perform this way?
2- With respect to 7.5 ton actual load in nodes 30/40, will these hangers be failed?
I look forward to hear from you.

Regards,
Mehdi

Top
#39308 - 12/01/10 02:20 AM Re: Spring Hangers [Re: loolekesh]
loolekesh Offline
Member

Registered: 02/05/09
Posts: 3
Loc: USA
Dear All,
Sorry, I send this post again, I forgot to attach file.
I have faced with an unusual problem in HP Steam line stress analysis. Please refer to attached sketch that shows there are two 12” steam lines that will be connected to together with new size 16”. The weight of valve “A” is 3.6 ton and valve “B” is 3.5 ton.
Because of the high deflection in this line (about 40 mm) I have to use spring hangers before, between and after these valves.
But when I did stress analysis the hot loads of hangers are as follow :
Spring Hangers 10/30 : App. 500 kg
Spring Hangers 20/40 : App. 7.5 ton
Spring Hanger 50: App. 6 ton.
That means the hangers 10/30 have a little effects on carrying the weights and also I like to have a simple spring hangers in nodes 20/40, actually I want to distribute the loads between spring hangers before and after valves.
So I entered the value 4500 kg in CAESAR II hanger input data (Operating load blank space) and when I did analysis the loads distributed properly between hangers 10/20/30 and 40.
My questions are:
1- Can I perform this way?
2- With respect to 7.5 ton actual load in nodes 30/40, will these hangers be failed?
I look forward to hear from you.

Regards,
Mehdi


Attachments
SPRING HANGERS.dwg (319 downloads)


Top



Moderator:  Denny_Thomas, uribejl 
Who's Online
0 registered (), 28 Guests and 1 Spider online.
Key: Admin, Global Mod, Mod
April
Su M Tu W Th F Sa
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30
Forum Stats
12065 Members
14 Forums
16973 Topics
75151 Posts

Max Online: 303 @ 01/28/20 11:58 PM
Top Posters (30 Days)