We have a doubt in load case building for a PSV force

Initially we built the load case as follows

L1 W+P+T+F
L2 W+P+T
L3 W+P
L4 F
L5 L2-L3(EXP)
L6 L3+L4(OCC) SCALAR COMB for Stress check

then we tried the following combination
L1 W+P+T
L2 W+P
L3 F
L4 L1-L2(EXP)
L5 L2+L3(OCC) SCALAR COMB for Stress check
L6 L1+L3(OCC) SCALAR COMB for Loads

The loads in the two cases viz., L1 of first combination and L6 of second combination were varying by large margin.Fyi there is non linearity in the form of friction.

then in the second combination we changed the combination type as algebraic for case L6 which produced the same result ( loads only) as that of Scalar

Now the two cases ,

W+P+T+F

and

W+P+T ( algebraic or scalar combination ) with F (seperately combining )

we would like to hear from you experts to clarify us why there is a difference between these two in terms of loads.

And also which combination method is right to evaluate the PSV forces in the system.
_________________________
Regards
Narine

Top
#35991 - 06/07/10 07:14 AM Re: Load case- PSV force [Re: usn]
Richard Ay Offline
Member

Registered: 12/13/99
Posts: 6226
Loc: Houston, Texas, USA
Supperposition does not apply for piping systems with non-linear boundary conditions. I suggest the following load cases:

L1 W+P+T+F
L2 W+P+T
L3 W+P
L4 L2-L3(EXP)
L5 L1-L2 (OCC) to get the effects of "F", not a stress check case
L6 L3+L5(OCC) SCALAR COMB for Stress check
_________________________
Regards,
Richard Ay - Consultant

Top
#38407 - 10/15/10 11:52 AM Re: Load case- PSV force [Re: Richard Ay]
maryamhajiloo Offline
Member

Registered: 10/06/10
Posts: 2
Loc: Alberta, Canada
Richard,

Thanks for your expert advice, My question is,should we consider these load combination for both design and operating pessure and temprataure or just the design condition is enough?

Regards,
Maryam

Top
#38417 - 10/16/10 11:43 AM Re: Load case- PSV force [Re: maryamhajiloo]
Richard Ay Offline
Member

Registered: 12/13/99
Posts: 6226
Loc: Houston, Texas, USA
Typically the design conditions are used to size the pipe and components, while the operating conditions are used for the flexibility analysis. However, there are exceptions, refer to these earlier posts on this same subject:

http://65.57.255.42/ubbthreads/ubbthread...=true#Post37853

http://65.57.255.42/ubbthreads/ubbthread...=true#Post24976

http://65.57.255.42/ubbthreads/ubbthread...=true#Post18213
Make sure you note the last post in this particular thread.


There are other posts on this subject if you [Search] for them.
_________________________
Regards,
Richard Ay - Consultant

Top
#38422 - 10/16/10 10:38 PM Re: Load case- PSV force [Re: Richard Ay]
Farhad Offline
Member

Registered: 04/25/07
Posts: 133
Loc: UAE
Dear Maryam,

Occasional load is applied when piping system undergo OPE condition. So, no need to use design conditions.
_________________________
Regards,
Farhad Salehi
--------------
What U give U get back !!!

Top
#38670 - 10/26/10 03:37 PM Re: Load case- PSV force [Re: Farhad]
maryamhajiloo Offline
Member

Registered: 10/06/10
Posts: 2
Loc: Alberta, Canada
Thanks a lot Farhad.

Top



Moderator:  Denny_Thomas, uribejl 
Who's Online
0 registered (), 43 Guests and 1 Spider online.
Key: Admin, Global Mod, Mod
May
Su M Tu W Th F Sa
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Forum Stats
12065 Members
14 Forums
16973 Topics
75151 Posts

Max Online: 303 @ 01/28/20 11:58 PM
Top Posters (30 Days)