No one will know why the anchor force is so high except for yourself, are you talking about an anchor in the buried section, or is it above ground near the soil penetration. There could be many reasons, such as:
- cold / hot piping (ie: high delta T) with insufficient flexibility in a stiff soil type
- incorrect modelling
- slug / surge loads
Is your pipe of welded construction, or is it made of push on joints? Do you even need an anchor? You do not have to worry about rack space, and if there are no surge or slug loads, then for welded pipe the soil would sufficiently restrain the piping.
I am not suggesting you post all your details of your system, as I think you should review your model keeping in mind the above ideas. If the load is as you say, and you do need the anchor, then I suggest you consult with your supervision and if necessary consider re-routing the piping.
Have you checked with your supervisor for advice?
_________________________
no signature