Hi All,

According to B31.3 piping systems which meet the criteria in section 319.4 shall be analysed.
But for nuclear code NB what will be the criteria to decide that which lines come into cirtial .

Top
#36758 - 07/09/10 02:21 AM Re: flexibilty requirment for nuclear code [Re: juice]
MoverZ Offline
Member

Registered: 11/22/06
Posts: 1195
Loc: Hants, UK
There are many other criteria that will flag a line as being critical, in addition to those indetifid in B31.3 319.4. and those are largely decided by the engineering contractor's procedures, or the Client's or both. For example, B31.3 para 319.4 makes no reference to strain sensitive equipment connections, since it is specifically concerned with flexibility, i.e. thermal or displecement stresses.

Likewise ASME III NB will give a certain amount of guidance, but there will be far more conditions that will make a line critical in addition.

Top
#36760 - 07/09/10 03:12 AM Re: flexibilty requirment for nuclear code [Re: MoverZ]
juice Offline
Member

Registered: 10/29/08
Posts: 34
Loc: Andhar Pradesh
Thank you moverZ

Top



Moderator:  Denny_Thomas, uribejl 
Who's Online
0 registered (), 27 Guests and 2 Spiders online.
Key: Admin, Global Mod, Mod
April
Su M Tu W Th F Sa
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30
Forum Stats
12065 Members
14 Forums
16973 Topics
75151 Posts

Max Online: 303 @ 01/28/20 11:58 PM
Top Posters (30 Days)