I'd need to see you input to answer specifically. However:
- The seismic analysis is only one of seven bolting requirements. Any one of these others could require additional bolts. You may also need a certain number (say 4) for load, but more (say 8) to achieve the minimum bolt spacing.
- As indicated above, if you needed more bolts for spacing, the actual stress in the bolts will be much less than the allowable.
_________________________
Regards,
Richard Ay - Consultant